PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Stripped the shear wall panels and the Elev. 1,2,3 door frames Facing South-West (800x600).jpg Deconstructing the shear wall panels Facing North (800x600).jpg Installing rebar mats at Elev. 4 (4th Floor) Facing South (800x600).jpg Installing rebar mats at Stair -2 (4th Floor) Facing South (800x600).jpg Backfilling and compacting at Room 105 (Servery) Facing East (800x600).jpg
Next page Stripped the shear wall panels and the Elev. 1,2,3 door frames Facing South-West (800x600)
Stripped the shear wall panels and the Elev. 1,2,3 door frames Facing South-West (800x600)